How to Manage Window and Door Repairs While You Wait on Special-Order Parts
September 20, 2026 · 3 min read

Every window and door company has them: repair jobs where the crew has already measured, the customer is waiting, and everything hinges on a part that won't arrive for weeks. A custom-size sash, a replacement pane of glass, a specialty screen. Nothing can be scheduled until it shows up.
These jobs are easy to lose. Here's a simple way to keep them from slipping through the cracks.
Why these jobs disappear
A job waiting on parts usually has no date, so it drops off the calendar. Nobody is assigned to it. The details live in someone's memory, a sticky note, or a text thread. Then one of three things happens: the customer calls to ask what's going on, the part arrives and nobody notices, or the job just sits.
None of these come from carelessness. The job simply has no place to live between "ordered" and "scheduled."
A simple system that works
1. Give waiting jobs their own status. "Waiting on parts" is not the same as "scheduled" or "unassigned." If every waiting job carries that status, you can see all of them in one place instead of hunting through notes.
2. Write down what was ordered and when. Record the part, the supplier, the date you ordered it, and the date it's expected. When a customer calls, you should be able to answer in ten seconds.
3. Set a regular check-in. Pick an interval, such as every two weeks, and look at every waiting job. Ask one question: has anything changed? If a part is late, find out now, not when the customer calls.
4. Tell the customer what happens next. Most frustration comes from silence, not from the wait itself. Tell them what was ordered, roughly how long it takes, and that you'll call as soon as it arrives.
5. Schedule the moment it arrives. When the part comes in, put the job on the calendar right away, assign a crew, and update the customer. Don't let a job that waited three weeks wait three more days for someone to notice.
What to tell your customer
A short, honest message goes a long way:
"Your replacement window is a special order, so it takes a few weeks to arrive. We've placed the order today. As soon as it's in, we'll call you to schedule the install."
If something goes wrong, say so. When a part arrives damaged or wrong, tell the customer what happened, that you've reordered, and when you'll check in again.
Don't forget the reorders
Defective glass and wrong-size parts happen. When they do, treat the reorder as its own waiting period: note what went wrong, record the new order date, and reset your check-in. A job that has been reordered twice is exactly the kind that needs the most attention.
Where ScheduleMe fits
ScheduleMe has an On hold setting for jobs waiting on special-order parts. Held jobs are gathered in one list on your dashboard, so you can see every one at a glance. ScheduleMe notes when you placed the hold and reminds your office every two weeks until you clear it. When the part arrives, you take the job off hold, schedule it, and your customer gets the usual reminder and status texts.
Whatever tool you use, the idea is the same: a job waiting on parts still needs a home, a date to check back, and a customer who knows what's happening.